21 March 2020

Berhenti Merokok...jom vaporise

Video ini hanya untuk tontonan mereka yang berumur 18 tahun ke atas sahaja dan ingin mencari alternatif untuk berhenti merokok. Mereka yang tidak merokok tidak disarankan mencuba untuk vape kerana vape adalah alternatif kepada mereka yang ingin berhenti merokok. Harap maklum.


18 March 2020

TERENGGANU DRAWBRIDGE - Sempat shoot sedikit semasa ia sedang diangkat...kebetulan.

Terengganu Drawbridge or Jambatan Angkat Terengganu is a bascule bridge (commonly referred to as a 'drawbridge') in Kuala Terengganu, Terengganu, Malaysia, which crosses the mouth of Terengganu River. The bridge is the fourth bridge in Kuala Terengganu City area that straddles the river after Sultan Mahmud Bridge, Manir Bridge, and Pulau Sekati Bridge. Kuala Terengganu Drawbridge is a part of the projects for the East Coast Economic Region (ECER). It is the first drawbridge built in Malaysia and Southeast Asia, constructed by Zelan Construction Sdn Bhd with a cost of RM248 million. The construction of the bridge started in August 2014 and was completed in mid-2019. This drawbridge is also a component in the development of Kuala Terengganu City Centre (KTCC). Its design was inspired by London Tower Bridge in London. The drawbridge has a 23-metre-wide single-carriageway that spans 638 metres over the mouth of Terengganu River. It connects Muara Selatan (South Bank), a reclaimed area in Kuala Terengganu city centre, near Tanjung and Muara Utara (North Bank) in Seberang Takir. It has a 12.5 metre clearance above water when the double-leafed span is closed. The clear span of the drawbridge is 50 metres long. There are four 15-storey towers, with each set of two towers connected by a skybridge. The towers contained with lobbies that allow visitors to go up to the commercial areas located at the skybridges. At night, the structures are lit up with colourful illuminations. The drawbridge allows users to cut their travelling time between Sultan Mahmud Airport as well as Universiti Malaysia Terengganu and Kuala Terengganu by about 15 minutes. A four-lane coastal road was built to connect the bridge with Kuala Nerus. The bridge was opened for trial from 2 to 17 June, during the Aidilfitri festive season. After a short closing period to allow other tests and improvement works to be carried out, it was fully opened for motor vehicles and pedestrians on 1 August 2019.

SELAMAT DATANG

FUEL CONTROLLER